Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    TIMES24H
    • Hot!
      1. Vietnam
      2. Asia
      3. Video
      Featured
      Hai Sau Sau (266) Partners with Samsung to Drive “One Samsung” Strategy in Vietnam

      Hai Sau Sau (266) Partners with Samsung to Drive “One Samsung” Strategy in Vietnam

      By Mike HarrisonNovember 13, 20250
      Recent
      Hai Sau Sau (266) Partners with Samsung to Drive “One Samsung” Strategy in Vietnam

      Hai Sau Sau (266) Partners with Samsung to Drive “One Samsung” Strategy in Vietnam

      November 13, 2025
      TechTimes Editors’ Choice 2024: 9Fit eBiz Mag Stand NFC Wallet – The Most Unique Mobile Accessory

      TechTimes Editors’ Choice 2024: 9Fit eBiz Mag Stand NFC Wallet – The Most Unique Mobile Accessory

      January 8, 2025

      BCP Vietnam and Vitalify Asia Launch the First A.I-Powered Business Matching Platform

      December 20, 2024
    • World
      • PR Newswire
      • Media Outreach
      • GLOBENEWSWIRE
    • Business
      Taiwan: The Global Powerhouse Shaping the Future of AI

      Taiwan: The Global Powerhouse Shaping the Future of AI

      August 29, 2025
      MEGA US EXPO 2025: A Hub for Innovation and Business Collaboration Between Vietnam and Korea

      MEGA US EXPO 2025: A Hub for Innovation and Business Collaboration Between Vietnam and Korea

      July 31, 2025
      Vietnamese Enterprises Engage with Global AI Innovations at COMPUTEX TAIPEI 2025

      Vietnamese Enterprises Engage with Global AI Innovations at COMPUTEX TAIPEI 2025

      May 19, 2025

      BCP Vietnam and Vitalify Asia Launch the First A.I-Powered Business Matching Platform

      December 20, 2024

      POPS Reaches Huge Milestone with 10,000 Enrolled Students

      December 16, 2021
    • Life
      1. Lifestyle
      2. Recipes
      3. Fashion
      4. View All
      XPPen Strengthens Its Commitment to Animation with 2026 Annecy Festival Residency Partnership and MIFA Showcase

      XPPen Strengthens Its Commitment to Animation with 2026 Annecy Festival Residency Partnership and MIFA Showcase

      July 5, 2026
      VinFast honored for investor relations excellence at the Asian Excellence Awards 2026

      VinFast honored for investor relations excellence at the Asian Excellence Awards 2026

      July 4, 2026
      Hong Kong Hosts Lions International Convention for the Third Time

      Hong Kong Hosts Lions International Convention for the Third Time

      July 4, 2026
      The VinFast VF 8 and the New Priorities of EV Ownership

      The VinFast VF 8 and the New Priorities of EV Ownership

      July 3, 2026

      Cooking tips for a smaller Thanksgiving celebration

      November 18, 2020

      Hanoi: A capital, and a kingdom of egg coffee shops

      November 16, 2020

      4 must-try recipes when you travel to Vietnam

      November 7, 2020

      Cutting-Edge Technology for Top Dentists

      December 24, 2021

      H&M faces boycott in Vietnam over “problematic map”

      April 7, 2021
      Pierre Cardin

      Ground-breaking French designer Pierre Cardin dies aged 98

      December 30, 2020
      JESSICA SIMPSON

      #HealthGoals: Jessica Simpson shows off 100 lbs weight loss in Christmas pajamas

      December 27, 2020

      Plane captain dies during Miami-Chile flight

      August 17, 2023

      French paintings of Vietnamese life a century ago exhibited in HCMC

      August 17, 2023

      Judge says accused TV contest not rigged

      August 17, 2023

      I don’t know how to tell my Christian parents-in-law I want a divorce

      August 17, 2023
    • Sport
    • Tech
      1. Gadgets
      2. View All
      9Fit and DTR Launch Vietnam’s First Smart Ring: A Leap Towards the Future of Wearable Technology

      9Fit and DTR Launch Vietnam’s First Smart Ring: A Leap Towards the Future of Wearable Technology

      December 12, 2024

      “Stupid windman” PC assembly experience based on Newegg ChatGPT

      March 29, 2023

      The value of the industrial cloud as an example of “the power of ecosystem, the power of expertise”

      March 29, 2023

      Machbase Releases Open Source Structured Time Series Database “Macbase Neo”

      March 28, 2023
      Taiwan Digital Day 2025

      Taiwan Digital Day 2025: Driving Vietnam-Taiwan Tech Collaboration in Ho Chi Minh City

      July 30, 2025
      Vietnamese Enterprises Engage with Global AI Innovations at COMPUTEX TAIPEI 2025

      Vietnamese Enterprises Engage with Global AI Innovations at COMPUTEX TAIPEI 2025

      May 19, 2025
      9Fit and DTR Launch Vietnam’s First Smart Ring: A Leap Towards the Future of Wearable Technology

      9Fit and DTR Launch Vietnam’s First Smart Ring: A Leap Towards the Future of Wearable Technology

      December 12, 2024

      “Stupid windman” PC assembly experience based on Newegg ChatGPT

      March 29, 2023
    Media Outreach Newswire
    TIMES24H
    Home»PR Newswire»SK Telecom Pursues 15GW AI Data Center Buildout, Aiming to Become Asia's AI Infrastructure Hub
    PR Newswire

    SK Telecom Pursues 15GW AI Data Center Buildout, Aiming to Become Asia's AI Infrastructure Hub

    Miley SelenaBy Miley SelenaJuly 5, 2026No Comments7 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    • Ulsan AI Data Center to expand to GW scale; 5GW to be activated in stages from 2029, reaching 15GW in total
    • SK Group brings together full-stack AI infrastructure capabilities; SKT to spearhead the overall project
    • Korea’s third national infrastructure revolution following the Gyeongbu Expressway and high-speed internet

    SEOUL, Korea, July 5, 2026 /PRNewswire/ — SK Telecom (NYSE: SKM, hereafter “SKT”) today announced that it will pursue the construction of an AI data center with a scale of up to 15GW. The goal is to become an AI infrastructure hub in Asia.

    The move is intended to preemptively build domestic AI computing infrastructure at a time when demand for AI model training and inference is surging and high-performance computing infrastructure determines national competitiveness.

    SKT is pursuing the project by linking it with the government’s “AI G3” strategy — the goal of becoming one of the world’s three leading AI powers alongside the U.S. and China — and the task of balanced regional development, comprehensively reviewing core infrastructure elements such as power, siting, and operations for the AI data center.

    • Ulsan AI Data Center to Expand to GW Scale; 5GW to Be Activated in Stages from 2029, Reaching 15GW in Total

    Due to the buildout of high-performance AI computing infrastructure and rising memory prices, constructing a typical 1GW-class AI data center may require a substantial project cost reaching approximately KRW 70 trillion. Such costs are expected to be financed not only through the company’s own investment but also through strategic partner investment, long-term customer contracts, and project financing.

    The backdrop to SKT’s move into building an AI data center at this scale is a global supply shortage. Global consulting firm McKinsey & Company forecasts that global data center demand will grow 19–22% annually while supply fails to keep pace, resulting in an estimated shortfall of about 15GW in the U.S. alone by 2030.[1]

    Accordingly, global big tech companies are expanding data center investment beyond the U.S. to locations around the world. In this context, Korea is drawing attention as an investment destination for global big tech companies’ AI data centers.

    Korea holds strong competitiveness in core AI components such as high-bandwidth memory (HBM). It also has stable power supply conditions based on nuclear power and liquefied natural gas (LNG), along with GW-class infrastructure operating capabilities accumulated through operating semiconductor fabs, making it an attractive location for AI data centers.

    Based on this solid demand and locational advantages, SKT plans to build AI data center capacity totaling 15GW.

    First, starting with the AI data center currently under construction in Ulsan, SKT will build a cluster of over 2GW across the southeastern region (Gyeongsang), using it as a base to attract AI infrastructure demand from global big tech companies to Korea. It also plans to build an additional 1GW in the southwestern region (Jeolla), bringing its domestic AI data center capacity to a total of 5GW to be opened in stages starting in 2029.

    To this end, SKT will pursue AI data center construction by considering various factors together — including site selection, power supply, and securing key anchor tenants — in connection with the government’s balanced regional development tasks and strategic supply plans.

    • SK Group brings together full-stack AI infrastructure capabilities; SKT to spearhead the overall project as AI Infrastructure Architect

    AI data center infrastructure hinges on three core elements: semiconductors, energy solutions, and data center construction and operation capabilities. SK Group already holds these core capabilities across its affiliates. This project will bring together the Group’s full-stack AI infrastructure capabilities, with each affiliate contributing its own strengths.

    In particular, SKT will take on the central role of leading the design, construction, and operation of the AI data centers. SKT has already been actively pursuing the AI data center business and has continued its cooperation with global big tech companies[2].  

    At SK AI Summit 2025 last November, SKT President and CEO Jung Jai-hun unveiled the company’s AI infrastructure roadmap, stating that SKT would lead the evolution of AI infrastructure as the nation’s leading AI operator. He also presented a longer-term blueprint for expanding cooperation with global big tech companies and scaling up the Ulsan AI Data Center to a total of over 1GW.

    More recently, SKT announced plans to operate an “AI Factory,” described as a next-generation AI data center. SKT plans to begin AI Factory operations in 2027 and expand it to GW scale going forward.

    • Korea’s Third National Infrastructure Revolution Following the Gyeongbu Expressway and High-Speed Internet

    The AI industry expects that AI data centers will serve not only as a new growth engine for Korea, but also as a national strategic asset. In particular, it is expected that linking AI data centers with regional industries will contribute to balanced regional development.

    The construction of a 15GW-scale AI data center is expected to serve as a springboard for Korea to become an AI infrastructure hub. SKT views AI data centers as Korea’s third innovative infrastructure, following the Gyeongbu Expressway (1968) and high-speed internet (1998), and intends to take a leading role in advancing it.

    “This AI data center project is aimed at preemptively preparing the computing infrastructure that the global AI ecosystem needs,” said Jung Jai-hun, President and CEO of SKT. “We will work closely with the government, industry, and local communities to help Korea grow into Asia’s core AI infrastructure hub.”

    About SK Telecom 

    SK Telecom has been leading the growth of the mobile industry since 1984. Now, it is taking customer experience to new heights by extending beyond connectivity. By placing AI at the core of its business, SK Telecom is rapidly transforming into an AI company with a strong global presence. It is focusing on driving innovations in areas of AI Infrastructure, AI Transformation (AIX) and AI Service to deliver greater value for industry, society, and life. 

    For more information, please visit our newsroom at https://news.sktelecom.com/en/ or our LinkedIn page at www.linkedin.com/company/sk-telecom.

    Forward-Looking Statements: Certain statements in this press release including, but not limited to, statements as to: SK Telecom’s plans, objectives and expectations regarding the development, construction, financing and operation of AI data centers and AI infrastructure; the planned development of AI data center capacity, including the phased development of projects in Ulsan and other regions of Korea; anticipated project timing, financing arrangements and strategic partnerships; expectations regarding AI Factory deployment, AI infrastructure demand and Korea’s position as an AI infrastructure hub; and other statements that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are subject to the “safe harbor” created by those sections based on management’s beliefs and assumptions and on information currently available to management and are subject to risks and uncertainties that could cause actual results to be materially different than expectations.

    Important factors that could cause actual results to differ materially include: global economic and political conditions; customer demand for AI infrastructure and services; the availability and cost of financing, computing resources, semiconductors, power, networking capacity and data center infrastructure; changes in governmental policies, applicable laws and regulations; the ability to secure strategic partners and customers; technological developments and competition; supply chain disruptions; the ability of SK Telecom and its collaborators and partners to successfully implement the contemplated initiatives and realize anticipated benefits; and other factors detailed from time to time in reports filed or furnished by SK Telecom with the U.S. Securities and Exchange Commission, including its most recent Annual Report on Form 20-F.

    These forward-looking statements are not guarantees of future performance and speak only as of the date hereof, and, except as required by applicable law, SK Telecom undertakes no obligation to update these forward-looking statements to reflect future events or circumstances.

    [1]  “AI Power: Expanding data center capacity to meet growing demand” (McKinsey & Company)

    [2] SK Telecom and NVIDIA Build AI Infrastructure to Power Korea’s AI Innovation (June 8, 2026) https://news.sktelecom.com/en/3124

      SK Group and AWS Team Up to Build Cloud Computing Infrastructure to Support AI Innovation (June 22, 2025) https://news.sktelecom.com/en/1948

     

    Cision View original content:https://www.prnewswire.com/apac/news-releases/sk-telecom-pursues-15gw-ai-data-center-buildout-aiming-to-become-asias-ai-infrastructure-hub-302817964.html

    SOURCE SK Telecom





    Source: PR Newswire

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    20x Profit in Two Years: How Reddog's 'K-Snack' Model Is Scaling Fast in South East Asia

    July 5, 2026

    Chongqing Summit Seeks to Bridge Capital and Industry as City Accelerates Economic Transformation

    July 5, 2026

    MALAYSIA'S GLOBAL UNIVERSITY ACHIEVEMENT SHOULD NOT BE MISREPRESENTED

    July 4, 2026
    Leave A Reply Cancel Reply

    Latest News
    XPPen Strengthens Its Commitment to Animation with 2026 Annecy Festival Residency Partnership and MIFA Showcase

    XPPen Strengthens Its Commitment to Animation with 2026 Annecy Festival Residency Partnership and MIFA Showcase

    July 5, 2026

    20x Profit in Two Years: How Reddog's 'K-Snack' Model Is Scaling Fast in South East Asia

    July 5, 2026

    Chongqing Summit Seeks to Bridge Capital and Industry as City Accelerates Economic Transformation

    July 5, 2026

    SK Telecom Pursues 15GW AI Data Center Buildout, Aiming to Become Asia's AI Infrastructure Hub

    July 5, 2026
    DMCA.com Protection Status
    Facebook X (Twitter) Instagram Pinterest

    © 2026 TIMES24H. All rights reserved

    TIMES24H is a global news platform delivering timely, reliable, and insightful coverage across technology, business, lifestyle, and current affairs. Our mission is to provide readers with clear perspectives and trusted information to navigate a fast-changing world.

    Type above and press Enter to search. Press Esc to cancel.