Close Menu
TIMES24H – International Breaking News
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    TIMES24H – International Breaking News
    • Hot!
      • Vietnam
      • Asia
      • Video
    • World
      • PR Newswire
      • Media OutReach Newswire
      • GLOBENEWSWIRE
    • Business
    • Life
      • Lifestyle
      • Recipes
      • Fashion
    • Sport
    • Tech
      • Gadgets
    Media Outreach Newswire
    TIMES24H – International Breaking News
    Home»PR Newswire»Shanghai Electric Secures First Overseas Heavy-Duty Gas Turbine Order for 500 MW Malaysian Project
    PR Newswire

    Shanghai Electric Secures First Overseas Heavy-Duty Gas Turbine Order for 500 MW Malaysian Project

    PR NewswireBy PR NewswireSeptember 14, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    [ad_1]

    SHANGHAI, Sept. 14, 2026 /PRNewswire/ — Shanghai Electric (SEHK: 02727, SSE: 601727) has achieved a milestone in the high-end overseas energy sector by securing the contract for Unit 3 of the Sarawak Samalaju Combined Cycle Gas Turbine (CCGT) Project in Malaysia. The win represents significant international recognition of Shanghai Electric’s heavy-duty gas turbine technology, underscoring the company’s growing competitiveness in the global gas turbine market.

    Under the agreement, Shanghai Electric will deliver a full EPC turnkey solution for the gas-fired power plant, coupled with a 25-year long-term service agreement (LTSA) covering all major equipment. Notably, every core component—from gas turbines and steam turbines to generators, heat recovery steam generators, and air-cooled systems—will be manufactured in-house by Shanghai Electric, which will also serve as the sole provider of the long-term maintenance and service program. This integrated, end-to-end capability gives Shanghai Electric full life-cycle coverage, spanning equipment manufacturing, systems integration, and multi-decade operational support—a vertical model that brings the company on par with the established global leaders in the heavy-duty gas turbine sector.

    Shanghai Electric’s current heavy-duty gas turbine lineup features two principal models, with output ratings of 300 MW and 78 MW, respectively. To date, the company has delivered 103 units, with total installed capacity from commissioned projects exceeding 21,000 MW. The units covered by Shanghai Electric’s long-term service and maintenance programs have accumulated more than 1.3 million operating hours. With robust production capacity available across both turbine classes, Shanghai Electric is positioned to offer new units for delivery as early as 2028. Beyond the Malaysian energy developer that awarded the current contract, project developers in Indonesia, Thailand, the Philippines, and Vietnam have also expressed strong interest in placing orders.

    SOURCE Shanghai Electric



    [ad_2]

    Source: PR Newswire

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Cavli Wireless Launches Cavli360, a Collaborative Industry Magazine Connecting the Global IoT Ecosystem

    Cavli Wireless Launches Cavli360, a Collaborative Industry Magazine Connecting the Global IoT Ecosystem

    October 28, 2026
    Envision Energy Unveils AI-powered New Energy System for Mining and Smelting Industry at All Energy Australia

    Envision Energy Unveils AI-powered New Energy System for Mining and Smelting Industry at All Energy Australia

    October 28, 2026
    OneQode Signs 14 MW AI Capacity Agreement with AdaniConneX, with a Path to 114 MW

    OneQode Signs 14 MW AI Capacity Agreement with AdaniConneX, with a Path to 114 MW

    October 28, 2026
    Leave A Reply Cancel Reply

    Latest News

    Wing Lee Proposes Placing of up to 100 Million Shares Raising Net Proceeds of over HK$90 Million to Deepen New Energy Business Expansion

    October 28, 2026
    65/2026・Trifork Group: Shareholders approve all resolutions at the Extraordinary General Meeting

    65/2026・Trifork Group: Shareholders approve all resolutions at the Extraordinary General Meeting

    October 28, 2026

    HKT inaugurates Innovation & Technology Centre and AI Exchange in the Loop

    October 28, 2026
    Opsera Relaunches as an AI-Native Software Factory for the Enterprise

    Opsera Relaunches as an AI-Native Software Factory for the Enterprise

    October 28, 2026
    DMCA.com Protection Status
    Facebook X (Twitter) Instagram Pinterest
    TIMES24H
    Global News · Trusted Information · Clear Perspectives
    TIMES24H is a global news platform delivering timely, reliable, and insightful coverage across technology, business, lifestyle, and current affairs. Our mission is to provide readers with clear perspectives and trusted information to navigate a fast-changing world.
    News & Editorial: news@times24h.com
    © 2026 TIMES24H . All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.