Close Menu
TIMES24H – International Breaking News
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    TIMES24H – International Breaking News
    • Hot!
      • Vietnam
      • Asia
      • Video
    • World
      • PR Newswire
      • Media OutReach Newswire
      • GLOBENEWSWIRE
    • Business
    • Life
      • Lifestyle
      • Recipes
      • Fashion
    • Sport
    • Tech
      • Gadgets
    Media Outreach Newswire
    TIMES24H – International Breaking News
    Home»PR Newswire»CATL and Quinbrook Build on Supernode Partnership Following Stage 2 and Stage 3 Major Milestones
    PR Newswire

    CATL and Quinbrook Build on Supernode Partnership Following Stage 2 and Stage 3 Major Milestones

    Miley SelenaBy Miley SelenaAugust 15, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    BRISBANE, Australia, Aug. 15, 2026 /PRNewswire/ — Quinbrook’s Supernode battery energy storage project has completed Stage 2 commercial operation and reached financial close on A$469 million financing for Stage 3, marking a further milestone in the phased development of Australia’s largest operational BESS campus.

    With planned capacity expected to exceed 3 GWh, Supernode is supported by CATL as its core energy storage system supplier for all three stages, providing advanced storage solutions and lifecycle support to enable reliable long-term operation.

    Located at Brendale, north of Brisbane, Supernode is adjacent to the South Pine substation, a key hub in the Queensland power system and the regional reference node for marginal loss factors (MLFs). This location provides a favourable MLF position and approximately 4,000MW of available connection capacity for phased expansion. The project’s development coincides with Queensland’s accelerating energy transition and the infrastructure investment cycle.

    Stage 3 has reached financial close on A$469 million in debt financing, bringing total project financing across Supernode Stages 1, 2 and 3 to approximately A$1.2 billion. Across its first three stages, Supernode is set to reach 780MW / 3,074MWh. Capacity across the three stages has been contracted under long-term offtake arrangements. 

    The long-term value of such assets depends on the continued availability, operational efficiency, safety and reliability of their energy storage systems. CATL has provided EnerC Plus systems for Stages 1 and 2 and will supply TENER S systems for Stage 3, establishing a consistent technology platform across the campus.

    In close collaboration with Quinbrook, CATL has supported project-specific design optimisation to enable high-density deployment within the constraints of available industrial land. EnerC Plus supports back-to-back installation, reducing the required site footprint by approximately 20% compared with EnerC. Its integrated liquid-cooling system maintains an internal container temperature differential within 5°C and is designed to deliver reliable operation over a 20-year lifecycle.

    CATL’s contribution extends beyond equipment supply. Under a Long-Term Service Agreement (LTSA), CATL will further support the full lifecycle of the energy storage asset through condition monitoring, performance tracking, fault response and preventive maintenance to help ensure reliable long-term operation. CATL’s proven product performance, scalable delivery capabilities and lifecycle service model provide greater confidence in the long-term reliability and performance of the energy storage asset.

    Tim Hornemand, Managing Director and Regional Lead, Australia, at Quinbrook, said:

    “Achieving commercial operations for Stage 2 means we’ve successfully delivered both Origin-contracted stages on schedule, an outcome we’re incredibly proud of given the complexity of commissioning utility-scale battery storage projects in Australia. With Stage 3 now fully financed, we’ve reached another important milestone in Supernode’s continuing development. The ongoing support of our banking partners also reflects confidence in the Supernode project, our delivery track record and the long-term outlook for battery storage in Australia.”

    Tan Libin, CCO and Co-President of Sales & Marketing at CATL, said:

    “Energy storage is evolving from a standalone technology deployment into a strategic energy asset. The next stage of industry development will depend not only on technological advancement, but also on the ability to create long-term value through collaboration, innovation and scalable deployment. At CATL, we are committed to working with partners to unlock the full potential of energy storage assets and support the transition toward a more flexible and resilient energy system.”

    CATL and Quinbrook are also working together on EnerQB, an eight-hour battery storage solution being considered for future stages of the Supernode development. The initiative builds on CATL’s role as energy storage system supplier across Supernode’s first three stages. CATL will continue to work with partners worldwide to deliver reliable technologies, scalable solutions and lifecycle support.

    SOURCE CATL





    Source: PR Newswire

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Q3 2026 J.S. Held AI Disputes Monitor Reveals Shift in AI Litigation from How Systems are Built to How They Behave

    October 15, 2026

    Bulgin Introduces 6000 Series Hybrid Buccaneer Connectors for Power and Signal Connectivity

    October 14, 2026

    DJI Delivers First Drone Dock with Automated, 25-Second Battery Swaps for Always-Ready Aerial Support

    October 14, 2026
    Leave A Reply Cancel Reply

    Latest News

    ZTE Hong Kong and LSCM Sign Memorandum of Understanding to Advance Hong Kong’s Digital and Intelligent Development

    October 15, 2026

    LISA and heytea Launch Global Collaboration Featuring Mango Coconut Sticky Rice Drink

    October 15, 2026

    ONYX Hospitality Group Wins Best Local Hotel Brand – Thailand for the Second Consecutive Year at the TTG Travel Awards 2026

    October 15, 2026

    Discover Surprising Southern Taiwan: Taiwan Tourism Administration Teams Up with Airlines & Travel Platforms with Multi-Million Rewards for International Travelers

    October 15, 2026
    DMCA.com Protection Status
    Facebook X (Twitter) Instagram Pinterest
    TIMES24H
    Global News · Trusted Information · Clear Perspectives
    TIMES24H is a global news platform delivering timely, reliable, and insightful coverage across technology, business, lifestyle, and current affairs. Our mission is to provide readers with clear perspectives and trusted information to navigate a fast-changing world.
    News & Editorial: news@times24h.com
    © 2026 TIMES24H . All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.