The interchange is located at the meeting point of the north-south railway line as well as the streets of October 23 and May 19.
Work on the VND1.3 trillion ($55.3 million) project began in 2017 in a build-operate form, with Phuc Son Group JSC being the lead developer.
It serves as a bypass, with drivers no longer required to enter downtown Nha Trang to cross the city.